Downloads

Downloads and Selection Checklist

Reference materials for engineering, purchasing and product teams. Prepare the checklist to speed up confirmation of DC gear motors, litter box motors and custom transmission solutions.

Before Inquiry

Recommended information to prepare

The more complete the information, the faster we can match a model, reduction ratio, output shaft and terminal plan.

01

Motor selection parameters

Voltage, target speed, rated torque, maximum load torque, noise target and lifetime requirement.

02

Mechanical installation data

Mounting space, output shaft drawing, fixing holes, rotation direction, wire routing and terminal model.

03

Control feedback needs

Hall, encoder, self-locking, stall protection, direction control or speed feedback requirements.

04

Project business information

Sample quantity, estimated annual quantity, target lead time, certification needs and cost range.

Checklist

Smart litter box motor quick selection checklist

The following items can be copied directly for engineering or purchasing colleagues.

Application structureDrum / rake / open screening / auto packing / other
Electrical parameters12V DC or other voltage, target speed, running direction and control method
Load requirementWorking torque, startup torque, maximum resistance and jam conditions
User experienceNoise target, lifetime hours, daily cycles and nighttime use requirements
Mechanical structureShaft size, mounting hole, wire length, terminal and self-locking needs
Production planSample time, first batch quantity, annual volume, packaging and delivery requirements

Cooperation Process

Fast selection evaluation for new smart litter box projects

  1. Requirement confirmationConfirm structure type, target speed, load torque, noise, lifetime and terminal requirements.
  2. Model matchingRecommend motor model, reduction ratio, output shaft, feedback signal and self-locking direction.
  3. Sample testingSample lead time is about 15 days for customer installation and function validation.
  4. Mass productionMOQ 1000 pcs, mass-production lead time about 25-30 days.

Need help organizing selection parameters?

Scan the WeChat QR code and send device structure, photos, drawings or existing motor sample information.

Scan WeChat QR Code
WeChat Products Top